Weather: mixed - warm and dry one minute and pouring with rain the next!
What we did:
- Carolyn worked on removing all of the sycamore seedlings from the beds at the rear of the church and also some from the bank behind church. There are so many this year and it will be quite a large job to get them all out. Wild flower seeds were then sowed into the beds.
- Michael moved all of the chopped down shrubs from the lower churchyard (left from when the City Council contractors cut down the shrubs on the bank between the lower churchyard and the church).
- Our newest team member, Dorothy then arrived. We all took a walk around the upper churchyard to show Dorothy around and to advise on the various health and safety issues as well as explaining some of the work which we have already done and what still needs to be done.
- We then all set to work on clearing some of the graves in the "ivy section" (section B). Peter and Dorothy worked on clearing two gravestones of the soil and other debris (see
photo) whilst Carolyn worked on removing ivy from nearby areas. Michael did the heavy stuff of wheelbarrowing away the foliage and also moving some other logs and rubble.
- At about 2 pm, the rain began to get heavy so we retreated into church and completed some indoor jobs.
No comments:
Post a Comment